Case study from Imperial College London - carbon reduction highly commended

Continuous Optimisation of Plant and Services – a partnership in sustainability by conserving carbon through energy reduction

Imperial College London is committed to provide a sustainable and operable estate, despite extensive refurbishment/new build and staff/student growth. We have implemented a strategy of re-commissioning building plant and services, “Continuous Optimisation”, delivering:

• Reduced carbon consumption
• Conserved energy
• Lower operational costs

In partnership with the academic community our annual accumulative savings are: £518,350 and 2,846 tonnes CO2.
Case study from Imperial College London - carbon reduction highly commended
click to enlarge

Downloads

Download file gga_hc_imperial_college_london_(carbon_reduction)_(2).pdf Imperial College London case study (511Kb) #3564